Universal Sealants (UK) Ltd Roads and Bridges Agrément Certificate No 02/R128 BRITDEX MDP (TWO COAT) BRIDGEDECK WATERPROOFING SYSTEM
Système d’étanchéité pour tablier de pontWasserdichtungsmittel für Brückentafel
Department for Transport, Local Government and the Regions,
WATERPROOFING SYSTEM,INCORPORATING A TWO-
1 Requirements
The requirements for Bridgedeck Waterproofing are given in the following
(a) Manual of Contract Documents for Highway Works, Volume 1 (MCHW1)
(b) BD 47 Waterproofing and Surfacing of Concrete Bridge Decks.
system for concrete decks ofhighway bridges in accordancewith the requirements of the
Department for Transport, LocalGovernment and the Regions,
2 Construction (Design and Management) Regulations 1994 (as amended) Construction (Design and Management) Regulations (Northern Ireland) 1995 (as amended)
Information in this Certificate may assist the client, planning supervisor,
designer and contractors to address their obligations under these Regulations.
3 Description, 4 Delivery and site handling, and
Sealants (UK) Ltd’s authorisedcontractors.
Readers are advised to check the validity of this Certificate by either referring to the BBA’s website (www.bbacerts.co.uk) or contactingthe BBA direct (Telephone Hotline 01923 665400). 3 Description 5 General
3.1 The Britdex MDP (Two Coat) Bridgedeck
5.1 The Britdex MDP (Two Coat) Bridgedeck
Waterproofing System is satisfactory for use onconcrete bridge decks of at least 28 days old with
Britdex MDP Primer — a two-part, solvent-free,
highly-reactive methacrylate resin, comprisingPart A and Part B.
5.2 Installation of the system should only becarried out at a minimum air temperature of 4°C
Britdex MDP Waterproofing — a two-part, solvent-
free, methacrylate resin, comprising Part A andPart B. 6 Precautions during installation
Britdex MDP Tack Coat — a single-component,
Health and Safety Data Sheets and a COSHH
solvent-based, acrylic resin solution, orange
risk assessment for the works should be deposited
with the Highway Authority and be maintained
Hardener Powder — 50% benzoyl peroxide with a
solid plasticiser, for use in Britdex MDP PrimerPart B and Britdex MDP Waterproofing Part B. 7 Durability
Results of tests indicate that the Britdex MDP (Two
manufactured by a batch-blending process. A
Coat) Bridgedeck Waterproofing System will
series of quality control checks is conducted on
provide an effective waterproof layer to the
each batch and on the combined components.
concrete bridge deck, provided it is not damagedduring subsequent resurfacing. 4 Delivery and site handling
4.1 The components are delivered as detailed in
Table 1. When correctly stored, the unopenedcontainers have a shelf-life of at least six months. 8 General
8.1 Installation of the Britdex MDP (Two Coat)Bridgedeck Waterproofing System should be
carried out only by contractors authorised andtrained by the Certificate holder.
25 kg Part A supplied in metal containers25 kg Part B supplied in metal containers
8.2 The Certificate holder is responsible for
25 kg Part A supplied in metal containers
training and monitoring its authorised contractors
23.75 kg Part B supplied in metal containers
to ensure that the system is installed in accordance
with the BBA agreed Method Statement and thisCertificate. 9 Preparation
4.2 The components are classified under the
9.1 Imperfections in the concrete deck should be
Chemicals (Hazard Information and Packaging for
reinstated by the Highway Authority with a material
agreed in consultation with the authorised
containers bear the appropriate hazard warning
label(s). Flashpoints and hazard classifications aregiven in Table 2.
9.2 The concrete deck should be clean, dry,and free from ice, frost, laitance, loose aggregate,
oil, grease, moss, algae growth, dust and otherdebris, and where the adhesion to the concrete
would be impaired, free from curing liquids,
9.3 The air temperature and relative humidity
should be recorded. The installation should onlyproceed if air temperature is a minimum of 4°C
and rising, and the bridge deck temperature is
10 Application
10.10 Britdex MDP Waterproofing is applied in
two coats, first coat pigmented yellow and secondcoat pigmented grey. Each coat shall be applied
10.1 Britdex MDP Primer can be applied by
to give a minimum wet film thickness of 1.2 mm to
spray, roller or brush, at a coverage rate of
ensure a minimum dry film thickness of 1 mm
0.20 kgm–2 to 0.40 kgm–2 dependent on the
overall, and a total minimum dry film thickness of
2 mm overall, including peaks, arrises and
10.2 Britdex MDP Primer is supplied as Part A
irregularities in the concrete deck.
and Part B. Immediately before use the hardener
10.11 The second coat shall be applied directly
powder (percentage by weight calculated on total
onto the first coat once it has cured. This will vary
Part A and B components) is stirred into Part B and
with temperature but is typically 20 minutes at
10.3 For spray application the quantity of
10.12 Where the waterproofing membrane is to
according to the ambient temperature ie 2% at
be joined to an existing Britdex MDP Waterproofing
30°C, 2.5% at 20°C, 3% at 10°C and 4% at
membrane and at day joints, the new application
5°C. The two components Part A and Part B of the
should be lapped onto the existing by a minimum
primer are metered and mixed in an airless spray
unit at a ratio of 1:1 by volume during application.
10.13 Where the existing membrane is clean,
10.4 For roller or brush application the quantity of
additional preparation is not necessary.
hardener powder in Part B can be variedaccording to the ambient temperature ie 1.5% at
10.14 Where the existing membrane is dirty or
30°C, 2% at 20°C, 3% at 10°C and 4% at 5°C,.
contaminated, the surface should be cleaned using
Part B is stirred into Part A of the primer at a ratio
of 1:1 by volume or weight and mixed thoroughly,
the material is then ready for application.
10.5 The primer can be overcoated with Britdex
should be terminated into a primed chase when
primer is fully cured and the surface is clean and
10.16 The integrity of the cured Britdex MDP
Waterproofing membrane shall be confirmed for
10.6 Britdex MDP Waterproofing can be applied
each coat application using a non-destructive
by spray, roller or brush at a coverage rate of
electronic test, prior to the application of the tack
1.5 kgm–2 per coat on a U4 surface. The coverage
rate will vary with surface irregularity.
10.17 Any defects identified in each coat
10.7 Britdex MDP Waterproofing is supplied as
application of the waterproofing membrane shall
Part A and Part B. Immediately before use the
be reinstated as in section 11 of this Certificate,
and only the repaired areas re-tested for each coat,
calculated on total Part A and Part B components)
prior to the application of the tack coat.
is stirred into Part B and mixed thoroughly. Part B is
10.18 The Britdex MDP Tack Coat should be
10.8 For spray application the quantity of
applied to the cured waterproofing membrane
only in areas due to receive the additional
according to the ambient temperature ie 2% at
protective layer (APL) of sand asphalt or hot-rolled
30°C, 2.5% at 20°C, 3% at 10°C and 4% at
5°C. The two components Part A and Part B of thewaterproofing are metered and mixed in an airless
10.19 Britdex MDP Tack Coat can be applied
spray unit at a ratio of 1:1 by volume during
either by spray, roller or brush at a coverage rate
of 0.1 kgm–2 to 0.4 kgm–2, to give a minimum wetfilm thickness of 0.3 mm on the cured membrane.
10.9 For roller or brush application the quantity of
10.20 The tack coat should be dry before the
application of the APL or HRA. Drying time of the
according to the ambient temperature ie 1.5% at
tack coat will depend upon site conditions. Typical
30°C, 2% at 20°C, 3% at 10°C and 4% at 5°C,
drying time for the tack coat is 30 minutes at
Part B is stirred into Part A of the waterproofing at a
ratio of 1:1 by volume or weight and mixedthoroughly, the material is then ready for
10.21 The APL or HRA should be applied without
undue delay after the tack coat application. 11 Repair of defects
Pin/blow holes11.1 After application of each coat, any
identified pin/blow holes should be overcoated
with Britdex MDP Waterproofing membrane at an
additional minimum wet film thickness of 1.2 mm
(1) Test documents are detailed in the Bibliography. Numbers/letters in
the tables refer to the sections/parts of the document.
11.2 Any blisters or damage should be made
good by cutting back to sound material, theperiphery prepared if necessary as for lapping and
a repair coat of Britdex MDP Waterproofingmembrane applied as in sections 10.10 and
10.11, ensuring a minimum peripheral lap of
concrete deck, the exposed concrete should first becleaned and then re-primed. 12 Surfacing
Temperature of the surfacing when applied should
exceed the minimum reactivation temperature of
80°C required for Britdex MDP Tack Coat.
The following is a summary of the technical
investigations carried out on the Britdex MDP (Two
Coat) Bridgedeck Waterproofing System.
Laboratory performance tests were carried out on
the system which achieved the BD 47 requirements
14 Other investigations
Surfacing to waterproofing system BD 47 B4.2(k)
14.1 A site trial was carried out to assess the
practicability of the installation and quality
14.2 The manufacturing process was examined,
including the methods adopted for quality control,
and details were obtained of the quality and
Surfacing to waterproofing system BD 47 B4.2(l)
(1) Test documents are detailed in the Bibliography. Numbers/letters inthe tables refer to the sections/parts of the document.
(a) are maintained at or above the levels whichhave been assessed and found to be satisfactoryby the BBA;
BD 47 Waterproofing and Surfacing of Concrete
(b) continue to be checked by the BBA or its
Bridge Decks, Appendix B Certification Test
Requirements for Waterproofing Systems onConcrete Bridge Decks
(c) are reviewed by the BBA as and when itconsiders appropriate; and
(d) remain in accordance with the requirements of
Works, Volume 1, (MCHW1) Specification for
the Department for Transport, Local Government
15.4 In granting this Certificate, the BBA makesno representation as to:(a) the presence or absence of any patent or
15 Conditions
similar rights subsisting in the product or any other
(a) relates only to the product that is described,
(b) the right of the Certificate holder to market,
installed, used and maintained as set out in this
supply, install or maintain the product; and
(c) the nature of individual installations of the
(b) is granted only to the company, firm or person
product, including methods and workmanship.
identified on the front cover — no other company,
15.5 Any recommendations relating to the use or
firm or person may hold or claim any entitlement to
installation of this product which are contained or
referred to in this Certificate are the minimum
(c) has to be read, considered and used as a
standards required to be met when the product is
whole document — it may be misleading and will
used. They do not purport in any way to restate the
requirements of the Health & Safety at Work etc
Act 1974, or of any other statutory, common lawor other duty which may exist at the date of this
15.2 References in this Certificate to any Act of
Certificate or in the future; nor is conformity with
Parliament, Regulation made thereunder, Directive
such recommendations to be taken as satisfying the
or Regulation of the European Union, Statutory
requirements of the 1974 Act or of any present or
Instrument, Code of Practice, British Standard,
future statutory, common law or other duty of care.
manufacturers’ instructions or similar publication,
In granting this Certificate, the BBA does not
shall be construed as references to such publication
accept responsibility to any person or body for any
in the form in which it was current at the date of
loss or damage, including personal injury, arising
as a direct or indirect result of the installation and
15.3 This Certificate will remain valid for an
unlimited period provided that the product and themanufacture and/or fabricating process(es) thereof:
In the opinion of the British Board of Agrément, the Britdex MDP (Two Coat) BridgedeckWaterproofing System is fit for its intended use provided it is installed, used and maintained as setout in this Certificate. Certificate No 02/R128 is accordingly awarded to Universal Sealants (UK) Ltd.
On behalf of the British Board of Agrément
For technical or additionalinformation, tel: 01923 665300.
Cuando uno tiene la colilla pequeña, tiende a compensarlo construyendopenes grandes. N o lo digo yo , sino F reud. Eso es lo primero que se me ocurre al mirar desde abajo la Cruz de losCaídos, que he visitado para conmemorar los treinta años de. aquello. Si en vez de Franco, hubiese gobernado digamos Nacho Vidal, el famosoactor porno, el monumento sería una llanura en medio de Castellón dela